When we started the bathroom was tired and needed modernising. We;
We offered to move the sink if it was possible tot but unfortunatley it wasnt.
So we shifted it as far left as possible to maintain access to the boiler housing.
The boiler housing was bespoke built by us, choosing a board to colour match the vanity unit our client has choosen.
Inside the boiler housing we made a removable panel to hide the pipework but to also allow access if need be. In front of the removable panel we also fitted some shelving.
Due to the cutting pattern for the boiler housing there was quite a big offcut.
So we designed a floor standing cupboard unit in the same material as the sink unit also.